Customer Feedback for Procore Technologies, Inc.

Welcome to the Customer Feedback Forum for Procore.

We’d like to hear any ideas you have for how we can improve Procore. Please use this forum to suggest features you’d like to see added to Procore. You may also vote and comment on product ideas suggested by other Procore users.

This forum is actively monitored by Procore’s Product Management Team.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. transmittals remove spaces in recipients field

    User would like to have a more compact view when there are multiple recipients in "To" field

    3 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  2. Daily Logs: Competent Person and Signature

    Provide a field on Daily Logs to indicate ******************************* onsite along with a place to capture signature.

    103 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. provide granular permission for setting document tags

    Need to allow users with Standard permissions on Document tool the ability to use the new tag / tagging feature.

    Granular permissions should provide following options:
    - create tags
    - delete tags
    - edit tags
    - set tags
    - view tags

    10 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  4. Drawing Markups Custom Photo Icon Color

    Allow photo icon when linking a Photo via markup to be different colors

    5 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  5. Air Quality

    Add Air Quality to weather report.

    3 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  6. OCR Raster Conversion Tool for Any Document

    Add an edit option that converts raster PDFs to be text searchable similar to Bluebeam's OCR tool, which should be applicable to any project tool documents that have been already uploaded as unsearchable raster PDFs.
    Current workaround is deleting the raster doc from Procore, converting it in Bluebeam, then reuploading the new searchable document to Procore. Keep it all in Procore!

    4 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  7. Favourites for Procore Drive

    I would like to see and Favourites in the Procore Drive to make it easier to navigate.

    19 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    4 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  8. Submittal Package: Bulk Action > Send Now

    Submittals - The ability to select which submittals in a package get sent off

    9 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  9. 4 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  10. Align Photos/Attachments with entry on PDF Export

    Be able to attach photos to equipment log, and for that picture to remain next to the log line, and not all be put after the log.

    14 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. Daily Log configure delivery fieldsets

    Allow Delivery Log to have configurable fieldsets

    2 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  12. Distribute Multiple RFI's at Once

    There should be the ability to distribute multiple RFI's at once. Right now, you can only distribute one RFI at a time with the email action. It makes it difficult to bring a new subcontractor up to speed who needs to see multiple RFI's. The problem with export the entire RFI log is that the sub will see more than necessary, and the sketches are not attached in the exported PDF.

    21 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  13. 10 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  14. Disable email attachment link when deleted

    When an email is sent to a user from a .pdf being attached to a workflow response, if the .pdf is then deleted from Procore, it can still be accessed via the Email link. Make it to where if the .pdf email is deleted from Procore, the link in the email is no longer valid to access that file.

    3 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  15. Pull Photos as Attachments with the Daily Log-Extract Tool

    I would like to be able to extract the photos associated with the daily log when I extract the daily log using the extract tool.

    2 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  16. RFI BIC filter should only filter for current user(s) with bic

    When you filter for RFI's with the Ball in court filter, you not only get a list of the RFI's with that user currently ball in court. You also get additional RFI's where that user is the assignee. Filtering for the BIC on RFIs, should only reflect the users who currently have the BIC and NOT include RFI's where the user is marked as an assignee.

    2 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  17. Meeting Minutes - Additional levels under items

    Meetings Tool
    There needs to be further levels under each item in the meetings tool. For example, you may have a meeting Category of "HEALTH AND SAFETY" and item "1.1 INCIDENTS". You may have 4 incidents to minute all under the item 1.1, however these may have difference descriptions, assignments, due dates, priorities and status's. The could be as follows: -
    1.1.1 - Cut Finger
    1.1.2 - Broken arm
    1.1.3 -Sprained ankle
    etc etc

    We have had feedback from our clients that are meeting minute are very hard to follow. I tender to agree with them and think resolve the…

    8 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  18. Submittals - Unlink revisions

    In Submittal revisions, when a new revision is created, there is no way to un-link the previous revision to stand alone. Currently, old revisions have a banner stating that it is an old revision but it would be better to have the option to un-link if you want to separate them.

    example situation:
    engineer wanted a new revision per the submittal required if subsequent information came along while reviewing the initial documents. Instead of a new one created, etc.

    3 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  19. Disable Submittal PDF mark up

    The ability to have the submittal mark up needs to be able to be turned off and on

    12 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  20. "Hide cost impact $$$ amounts" granular permission on intructions tool

    We need a granular permission in the instructions tool to hide the dollar amounts for read-only users.

    Sometimes, for negotiation purposes, you don't want your subcontractor to view the $$ amount that was entered by the Owner or the Architect when they created the instruction.

    The reason being, it can be counterproductive to show your sub the $$ amount from the designers or from the client before you send them the RFQ

    4 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base