  1. Inspections - Allow Letters & Special Characters in Number Field

    Want to be able to add special characters to my Inspection number

    59 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    12 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  2. Punchlist navigation - use back arrow to return to previous page

    I have a punchlist that is over 500 items. On the punch list screen, I navigate to page 6 (or 7 or 8...) in my list and view a particular punch item. After I am done viewing that particular punch item, I hit the back arrow on my browser. The problem is that I am taken back to the first page of my 500+ punch items. I would prefer in this situation to be taken back to page 6 where I initially came from.

    52 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  3. Inspections - make 'spec section' and 'linked drawings' available on project level inspection templates.

    It would be extremely beneficial to include the 'drawing links' and 'spec section' fields within a project level inspection template. This way, items created from the template will pull in the linked drawings and corresponding spec sections. It would also be a huge benefit to build a dynamic (drawing links) field that will automatically update when markups are added or revisions are uploaded, and make these fields (linked drawings/spec sections) available to utilize on a project level inspections template.

    10 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  4. Punch List - Bulk Edit - for all pages and some pages

    Delete person of our choice, not only for the whole (bulk edit)

    We need to change for all other responsable and for the person of our choice too, not only for the whole

    We need to be able to delete a person for all options of person assignments and for all deficiencies on a page and or for all pages; if there are more than one page of 100 deficiencies for example

    When we have 1000 deficiencies, we have to delete one person assigned a deficiency at a time.

    16 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  5. Punch List Area Manager/Final Approver

    Just as you can set a default punch list manager and final approver by "Types" it would be extremely helpful to have a default manager/final approver by "Area" instead. Often project teams divide the building by area, not by "division" or subcontractor.

    15 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  6. Add Origin Filter to Observations

    Observations need a filter for Origin (either the specific origin or the template). This would make reporting much easier so that we can easily view all observations generated from a specific inspection. Without this, it's difficult to see the effectiveness of our inspections plus ensure that all observations of the same type are closed.
    This filter should be enabled in the Reports tool AND in the main Observations tool.

    9 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    4 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  7. Can't close inspection with open observation

    Should have the option to not be able to close inspections if a linked observation is open

    13 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  8. Inspections - Set a Default Response Set

    When creating an inspection template, if you plan to utilize a custom response set, you have to individually choose that custom response set for each item. The ability to set your default response set for your templates before you create them would be helpful and would cut down on time spent building these templates.

    12 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  9. Delete Custom Fields

    Client would like to be able to delete the Custom Fields in the Observations tool.

    With so many Custom Fields that get created, without the ability to delete the ones that are no longer needed or were created with misspellings or accidentally, they get quite cluttered.

    14 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  10. Create Observation from Daily Log

    Create an observation from Daily Logs if a sub has not created a time entry, Allow the observation manager to send this to the trade partner and the PM of that job.

    82 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. Company Inspection Templates - Ability to Organize When Adding New Items in Project Level

    When using a company-level Inspection template within a project, you have the ability to add new sections/items that are more specific to the project. Currently, these cannot be moved between or above the company-created sections/items. This can cause situations where related sections are listed in the company template, then at the very bottom with the project-specific additions. Please add in the ability to reorganize the template using those project-specific additions, including the ability to move project-added sections/items above the company-added sections/items.

    10 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  12. Rotate Photos on Inspections & Observations

    Would like to have the option to rotate photos when adding them to Inspections or Observations.

    It is difficult when photos need to be rotated, to have to do so in the device and then log in to the Procore app to create the item. It would decrease the time spent on creation.

    8 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  13. Inspection Reminders

    Ability to send routine reminders to field staff to complete inspections

    10 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  14. [Inspections] - Edited Company Template Should Update Project Inspections

    Currently, If you edit a template at the company level, it will not change project level inspections that are already built off of that template. However, it is imperative to our company that these changes to the company template retroactively update the project inspections that use those templates as we are constantly updating and refining our questions.

    3 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  15. Clone a Completed Inspection at the Project Level

    Often times we need to inspect something on a daily basis, even if there are no changes to the status of the instance. In these cases, it would be very beneficial for us to be able to clone an existing inspection template that has already been filled out so users do not need to re-input responses for all of the inspection items. The signature field in the Inspection would keep people honest.

    4 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  16. Company Form Templates should be able to pull Project specific info automatically when used on that job.

    Company Form Templates should pull the job name/number from the job it is being used on.

    10 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  17. Inspections - Auto-Save Closed Inspections in Documents Tool

    automatically sync a finished inspection from procore to procore documents tool

    8 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  18. Delete Comments in Punch Item

    Ability to delete a comment made in a punch list item.

    2 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  19. Copy inspection templates from one project to another

    There shall be a way to copy inspection templates from one project to another, instead of writing a whole new inspection template.
    I know there is a way of having the inspection template at company level. But that is not feasible for all scenarios. What if you want a inspection template to be on 10 other projects but not all other 100s of projects.

    6 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  20. Track GPS Location in Inspections

    When conducting Inspections on horizontal projects (ie, pipelines, roads), need to track location and GPS information.

    2 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →