  1. Move Change Event Info Location on PCOs

    The Change Event information is located at the bottom of the PCO in Procore thus causing the owner /client to think that it is the total amount.

    Move the location of the Change Event information so it does not appear at the bottom of the PCO.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financials  ·  Flag idea as inappropriate…  ·  Admin →
  2. Grouped Data in Custom Report Not Tiered

    Looking to have options with the tiering structure and be able to have them stack more vertically then tiering out to the right like they do now

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Reports  ·  Flag idea as inappropriate…  ·  Admin →
  3. 1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financials  ·  Flag idea as inappropriate…  ·  Admin →
  4. 1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Drawings & Specifications  ·  Flag idea as inappropriate…  ·  Admin →
  5. Commitment Ledger report

    Need to run a report that includes the complete snapshot of a commitment with a setting to run either for all commitments for a project or just a single commitment.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financials  ·  Flag idea as inappropriate…  ·  Admin →
  6. Punch List - Allow Letters in Punch Numbering

    Please change Punch List numbering to strings instead of just integers so it works like all the other fields. With RFIs, Submittals, Observations, etc we can call number it say WSSN001-001 instead of just "1" for the number. Punch list is the only item we cannot do this, it helps with tracking items.

    0 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  7. 1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  8. Respect DocuSign Permissions in Procore

    It has been brought to my attention that the export of any DocuSign document includes the entire envelope, within these envelopes some of the documents are set to limited visibility to restrict the Subcontractor from viewing a specific page that we have inserted in DocuSign within the envelope. When DocuSign and Procore talk to each other to show the export PDF complete package it allows this same Subcontractor to view the hidden page. Can we please review this as a priority with the correct person, to get this resolved?

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Integrations & App Marketplace  ·  Flag idea as inappropriate…  ·  Admin →
  9. Zoom out to view more pages in the Submittals tool (iOS)

    View up to 12 pages at once, rather than only 2 in the Submittals tool in iOS app

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    Reviewed - Not Prioritized for Development  ·  0 comments  ·  Mobile  ·  Flag idea as inappropriate…  ·  Admin →
  10. Revert to Previously Distributed Minutes

    When making an error by forgetting to create a follow up meeting and typing the current minutes over the previous minutes, it would be nice to be able to revert back to the minutes previously distributed.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. 1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Quality & Safety  ·  Flag idea as inappropriate…  ·  Admin →
  12. ERP Job Costs reports and export to PDF

    Regarding ERP Sage Integration:

    Two things that would be helpful are:

    (1) adding an export button to the Job Costs tab and

    (2) allowing for a global Job Costs report where I can filter for duplicates without having to go project by project.

    It’s possible that other jobs are running into this issue on a smaller scale, but the only way I would know about it is to go into every single project and repeat the above process, which is too time-consuming to complete without the aid of some sort of report.

    Thank you for the help on this.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financials  ·  Flag idea as inappropriate…  ·  Admin →
  13. Recover Missing Data on iOS

    When data is lost due to a failed upload, be able to recover it.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Mobile  ·  Flag idea as inappropriate…  ·  Admin →
  14. Comma in Change History "Action By" field

    When a change has been prompted through a workflow and not by an actual user., it shows a comma instead of some other indicator to let you know that it was done by the workflow. This can e very confusing to those who do not realize how these actions were completed.

    This should be changed so there is another indicator that the action was completed by the workflow.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  15. 1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Preconstruction  ·  Flag idea as inappropriate…  ·  Admin →
  16. Old revisions of submittals BIC change

    Have older revisions of submittals to still show as open, but there should be no BIC as all the work is now being done on the newer revision. And then have all revisions close when the newest revision closes.

    2 votes
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

  17. Warning banner when giving access to locked subfolder under locked parent folder

    When giving permissions to a non-Admin user to a locked subfolder, it would be helpful to have a warning banner/popup that lets you know that this user will also need permissions to the locked parent folder.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  18. Viewing Drawing Links

    When clicking on a link on a drawing, it would be nice if the linked item didn't open in a separate tab, but instead, Procore took you to the linked item in the current window/tab.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Drawings & Specifications  ·  Flag idea as inappropriate…  ·  Admin →
  19. Bulk Download Issues Log Attachments

    Add an option to bulk download attachments on an issues log under custom tools.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  20. Bid update

    instead of having to open each code first that it would automatically "open" all the cost codes based on the subs.

    1 vote
    Sign in Sign in with: Procore Okta
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Project Management  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base