AdminRobert Hudman (Sales Engineer APAC, Procore)

My feedback

  1. 48 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We need the ability for supervisors to enter timesheets for multiple project times in one entry as this is often the use case for our works.

  2. 12 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    Looking for the ability to deal with ongoing maintenance works including scheduling maintenace trades on site, or integrate with something that does.

  3. 34 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    There are too many fields in the Submittals Tool. We would like to be able to have the configurable fieldsets feature added to the Submittals tool. Ideally it could be configured by Submittal Type.

  4. 37 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We need to have a clear and centralised record of all outbound and inbound communication from the project tools. All such communication should be routed through the emails tools, so it can then be easily searched and found (see also request for Advanced Email Search)

  5. 3 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We would like to see the Timesheet Tool integration to the MYOB Timesheet function. This will allow much more effective timesheet and payroll processes.

  6. 14 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We need the Sage 300 integration to have Accounts Receivable (AR) integration.

    We want to create the Claims/Invoices against the Head (Prime) Contract, send these to Sage 300, then have payment received come back from Sage 300.

  7. 202 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    This feature is currently available in Procore for syncing Subcontractor Invoices to Quickbooks. For more information on this new release please reach out to your Procore rep or visit our support site here support.procore.com/product-releases/new-re…

    For Sage 300, Sage 100, Spectrum & Vista, no development work has started yet for syncing Subcontractor Invoices, but stay tuned!

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We need the Sage 300 integration to provide for Accounts Payable (AP) sync.

    We want to use the Procore Commitment Invoicing feature to be able manage claims in Procore, send these to AP in Sage, and then have payments come back across.

  8. 90 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We really like the Labour Productivity tool, however see a real gap in that the Labour Budget is not brought into the Budget and Forecasting in the financial product line.

    We would like to see the Labour Budget part of the main financials budget, as well as have remaining hours automatically added into Forecast.

  9. 274 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    When users are added to a distribution group, they should also be subscribed to the drawings, specifications etc that that distribution list was previously subscribed too.

    Also, would like to have tick boxes when adding a new user to subscribe them to drawings and specifications.

  10. 23 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We need more drawing statuses, other than "published" and "unpublished". These statuses should also read back from andy workflows these drawings are in from the Submittals Tool.

    See also this request:
    https://feedback.procore.com/forums/183340/suggestions/38108548

  11. 6 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We are finding it difficult to work with the Submittals tool, as there is no status on documents/files/drawings when multiple area added to one submittal.

    While we could have a 1:1 relationship (one document per submittal), this is impractical as we have 1000's of documents to push through the Submittal process.

    Without having status on the Submittal items, it is difficult to properly understand where items are in the workflow approval (submittal) process at any time.

    Additionally, the documents added to a submittal from the Drawings & Documents tool do not read back to their original location. We need statuses on drawings and documents to read from the Submittal they are contained within.

  12. 103 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We would like to rename the "Approved" role in the Submittals tool (workflow) to "Reviewer". Using the work "Approver" is causing some concerns for project collaborators.

  13. 8 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

  14. 100 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    Hold points in workflow (submittals) required to avoid unnecessary work, i.e. if the structural engineer rejects drawing, it should stop the workflow and not go to architect next step

  15. 37 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    Our meeting structure requires that there are three tiers to the meeting tool. Currently only two tiers are available (Section and Item).

    We are looking for Section, Sub-Section, Item.

  16. 4 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) supported this idea  · 
  17. 14 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We need to have Inspection Template versioning control. As we evolve and update the templates, we need to be able to clearly identify the current version and access previous version as required.

    Additionally, we would like to be able to assign an Inspection Template number to each template. This would provide a better reference for our overall safety system.

  18. 19 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    In a mobile situation, we need the ability to look up and attach items from the Documents tool when we are completing inspections and/or Observations.

    Currently in mobile you can only attach photos.

    An example would be to attach the SWMS (Subcontractor Safety Documents) to an Inspection when we are auditing their compliance.

    While this request is focused on Observation and Inspections, we could see merit in this being functionality for all 'attachment' functions on mobile tools.

  19. 21 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    We would like to be able to create 'Positive' gauges in the Custom Report visuals to be able to set target for items we want to be able to achieve minimum results or effort on.

    For example, minimum number of Inspection, positive Observations etc.

    All this would basically be a reversal of the colors current used in gauge visuals. So instead on going Green->Orange->Red, the gauge would have the option to go Red->Orange->Green.

    This would help inspire the team to achieve minimum number for set objectives.

  20. 127 votes
    Sign in Sign in with Procore
    Signed in as (Sign out)

    We’ll send you updates on this idea

    AdminRobert Hudman (Sales Engineer APAC, Procore) commented  · 

    Need inspections created in the Inspection Tool to automatically populate into the Inspection Log on the Daily Log (Site Diary) for that day.

    The Daily Log (Site Diary) is a critical record of things that happened on the project that day and we need inspections to auto-populate into it from the Inspection Tool.

← Previous 1 3

Feedback and Knowledge Base